

By Order


This equipment serves for the production of roll polyethylene bags and has the ability to wrap the roll in 2 rows. The total power of the equipment is 13 kW, the weight is 3500 kg and the dimensions are: length 7250 mm, width 2750 mm and height 1670 mm. The working speed reaches a total of 600 pcs.
| Basic parameters | ||
![]() |
Model | US-XJBXJ-460*2 (B) |
| Max. bag width | 400 mm * 2 lines | |
| Max. bag length | 600 mm | |
| Paper tube inner hole diameter................................................................ | 35 mm............................................................................... | |
| Sealing cutting thickness | 0.008-0.03 mm | |
| Production speed | 600 dona/min | |
| Total power | 13 kW | |
| Machine dimension | 7250*2750*1670 mm | |
| Weight | 3500 kg | |
By Order


This equipment serves for the production of roll polyethylene bags and has the ability to wrap the roll in 2 rows. The total power of the equipment is 13 kW, the weight is 3500 kg and the dimensions are: length 7250 mm, width 2750 mm and height 1670 mm. The working speed reaches a total of 600 pcs.
| Basic parameters | ||
![]() |
Model | US-XJBXJ-460*2 (B) |
| Max. bag width | 400 mm * 2 lines | |
| Max. bag length | 600 mm | |
| Paper tube inner hole diameter................................................................ | 35 mm............................................................................... | |
| Sealing cutting thickness | 0.008-0.03 mm | |
| Production speed | 600 dona/min | |
| Total power | 13 kW | |
| Machine dimension | 7250*2750*1670 mm | |
| Weight | 3500 kg | |
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Contact us for pricing!
To'liq ma'lumot olish va tijorat taklifini ko'rish uchun biz bilan bog'laning.
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer
Delivery will be made in 20-40 days
Uskunalar.uz logisticsIf the equipment is not available in stock, its production at the factory will take an additional 15–40 days.
With qualified technological services
Installation and commissioning service is provided
Convenient payment method for you
Cash, card, or money transfer